Georges Jamet

Work on the Saint-Malo locks (August 2003)

Cutout of the north door

The replacement of the downstream gates of the locks was carried out in August 2003. During all the works, access to the harbor wet docks was impossible.
The first phase of the work involves removing the old doors. To do this, they are cut with a blowtorch. Here, the cutout of the north door.

©Georges Jamet | Editor : Hervé Jamet | Hosting : OVH